    Default Average Machine Shop Turnaround

    What is considered an average/decent turnaround time to have all 8 hole bored 30 over and finish honed? That is all that needs done to the block and that is all that was requested to be done.

  2. #2
    Join Date
    May 2007
    Location
    Pa
    Posts
    486

    Default

    2 to 3 day pending on the machine shop. I've seen some take as much as a week

  3. #3
    Join Date
    Jun 2010
    Location
    Santa Land
    Posts
    554

    Default

    Right now I get my stuff back in 2-3 days. In the spring and early summer you better count on a little longer.
    My sarcasm is a pre-emptive strike to your stupidity!!

  4. #4
    Join Date
    May 2007
    Posts
    240

    Default

    Back to top with this. Can you believe the shop has yet to touch my block? This is a shop that pretty much begged for my business. I am going to pick it up tomorrow morning and take to my usual and RELIABLE shop.

    Live and learn.

  5. #5
    Join Date
    Jan 2008
    Posts
    995

    Default

    This time of year if you are using a high-quality machine shop that a lot of racers like to use wait time could easily exceed a month. I dropped a block off about a month ago to get built up and it just got dyno'd the day before yesterday. The other shop all the racer's like to use is booked til April as well.

  6. #6
    Join Date
    Jan 2008
    Posts
    995

    Default

    Didn't realize you had dropped it off in December. Yeah that is pretty much BS.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

All times are GMT -5. The time now is 05:13 AM.


Powered by vBulletin® Version 4.2.0
Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.