How about starting later and heavy watering right before race time
Tri city speedway
Collapse
X
-
Need the water 10 12 inch down.. If you just toss a bunch on top it stays on top and makes mud..Want the water coming up so it best to start a day or 2 befor hotter it is the more water need day befor..Once you got it the way you want it you got too keep putting water on it or it drys up.... Its a Art too do it right...Originally posted by old fan View PostHow about starting later and heavy watering right before race time
Comment
-
I live within sight of the track. They had been watering the track since Tuesday. With the high temps and direct sunlight it backed the top of the track. It is mainly a gumbo track. Too much water and it ends up so rough that we all tear stuff up all night. The track was really racy until half way through the latemodel a main. That is how pierce was able to overtake moyer. Once the bottom rubbered up it was a train show though. Im not just saying this as a fan in the stands, I raced my mod there.
Comment
-
I thought it looked fairly racy too for the first half of the race. Pierce said it was good as well.Originally posted by dirtracerl77 View PostI live within sight of the track. They had been watering the track since Tuesday. With the high temps and direct sunlight it backed the top of the track. It is mainly a gumbo track. Too much water and it ends up so rough that we all tear stuff up all night. The track was really racy until half way through the latemodel a main. That is how pierce was able to overtake moyer. Once the bottom rubbered up it was a train show though. Im not just saying this as a fan in the stands, I raced my mod there.
Comment
-
Ok!! Then lets say if Feger and Bobby would not have been racing hard at Cedar Lake. Moyer would have never caught either of them.Originally posted by pkracer View PostHe passed Moyer because he got off the bottom on a restart. If he hadn't done that Pierce would have never got around him.
Comment
-
that's very true but starting later will certainly helpOriginally posted by Cardirt0 View PostNeed the water 10 12 inch down.. If you just toss a bunch on top it stays on top and makes mud..Want the water coming up so it best to start a day or 2 befor hotter it is the more water need day befor..Once you got it the way you want it you got too keep putting water on it or it drys up.... Its a Art too do it right...
Comment
Comment